Rod el Farag Axis Bridge
The 1,000 kilos of Xypex Concentrate required for the Rod el Farag Axis Bridge project were provided by the Xypex distributor for Egypt, Beton Alexco, of Alexandria, Egypt. It took the Arab Contractors crew just 24 hours to treat the six main columns of the Rod el Farag Axis Bridge with Xypex Concentrate. The huge towers support 160 separate steel cables, requiring 1,500 km (870 miles) of steel wire. The towers are built on more than 6,000 pilings.
“The Xypex Concentrate will provide protection for this historic bridge for the lifetime of the structure without any further maintenance or renewal,” says Amr Saad. “Our market here in Egypt is gradually growing to understand the difference that Xypex crystallization technology provides. No other product on the market has the proven experience and research results that we do. When customers want the best, they come to us.”