Alex West Compound

The Alex West compound, completed in 2024, is a prominent development located along the development axis, in front of Mariout Lake, near Alexandria, Egypt. This project benefitted from the expertise of ECG as the consultant and United Construction Company (AlMotaheda) as the main contractor. The foundation waterproofing was meticulously executed by Black Rhino under the…
Learn more

Mountain View Icity

The Mountain View Icity project, completed in 2023, is a landmark development located in New Cairo, Cairo, Egypt. This project involved extensive waterproofing of the retaining walls to ensure long-term durability and structural integrity. The waterproofing work was expertly carried out by City Build, led by Eng. Arnest Fayez. The specification for the waterproofing solutions…
Learn more

High Speed Train Station Wady El Natroun

The High Speed Electrical Train project connecting Ain Sokhna and Al Alamein, under the supervision of the main contractor Hassan Allam Construction and consultant ECG, used Xypex crystalline waterproofing technology to ensure the durability and longevity of its infrastructure. The retaining walls at the Wady El Natroun station is protected using Xypex Concentrate, supplied by…
Learn more

Ramses II Statue at the Grand Egyptian Museum

In 2018, the Grand Egyptian Museum (GEM) in Giza undertook the relocation of the 83-ton, 3,200-year- -old statue of Ramses II—a monumental piece of art and history. The primary objective was to preserve this unique historical artifact and provide a more suitable environment for its display and appreciation. The meticulous execution of the relocation necessitated…
Learn more

Sawary Alexandria Phase 4 Malls Area

Located in the district of Alexandria, Sawary Alexandria Phase 4 focuses on constructing a three new new malls. Like other regions of the city, the soil and groundwater exhibit elevated chloride levels, posing a significant threat to concrete and the reinforcing rebar. To mitigate the risk of corrosion in the foundations of the three new…
Learn more

Valore Smouha Compound

The Valore Smouha Compound, executed by Elghonimy for trading and contracting, involved extensive waterproofing efforts due to significant water pressure and uplift challenges. Beton, for consulting and construction chemicals, provided the waterproofing specification, and ALBatanony, for engineering and contracting, handled the waterproofing and concrete supervision. Xypex Admix C-1000 NF was integral to this project, with…
Learn more

San Giovanni Hotel Renovation

San Giovanni Hotel, established in 1938 and one of Alexandria's historic landmarks, is situated in front of the Mediterranean Sea in the vibrant Stanly district. In 2016, the hotel underwent extensive external renovation and restoration to upgrade its concrete structure, ensuring its longevity and preserving its architectural heritage. To achieve the renovation goals, Xypex Concentrate…
Learn more

Village West Compound

Located in Sheikh Zayed, Cairo, the Village West Compound is a development by the Dorra Group, completed in 2023. To ensure comprehensive waterproofing of the compound's concrete structures, Beton for Consulting & Construction Chemicals specified Xypex Concentrate. This advanced crystalline technology makes concrete permanently waterproof, resistant to hydrostatic pressure and chemical attack, and capable of…
Learn more

Alex Tend Compound

The Alex Tend Compound, an upscale residential development located in King Mariut near Alexandria, required comprehensive waterproofing for its swimming pools and water features. Xypex Concentrate was used to provide durable waterproofing and protection. Xypex Concentrate was chosen for its ability to create a crystalline structure within the concrete, effectively blocking water pathways and enhancing…
Learn more

Sawary Alexandria Foundations Waterproofing

In some regions of Alexandria, Egypt, the soil and groundwater exhibit elevated chloride levels, posing a significant threat to exposed concrete and rebar. Preserving the integrity of these concrete elements is paramount to the durability of the structure. To mitigate the risk of corrosion to the reinforcing steel, the engineering team overseeing the Sawary Alexandria…
Learn more

Alexandria Specialty Petroleum Products Co.

The Alexandria Specialty Petroleum Products Company completed a major wastewater project in 2024 to upgrade its infrastructure in Alexandria, Egypt. This project aimed to improve the durability and integrity of the concrete structures in the wastewater system. To achieve these goals, Xypex Admix C-1000 NF was incorporated into the concrete mix. This addition made the…
Learn more

Grand View Compound

The Grand View Compound project, completed in 2022, located in Smouha, Alexandria, Egypt, utilized Xypex Concentrate to provide superior basement waterproofing across a 21,000 square meter area. In collaboration with the waterproofing applicator, the main contractor, Hassan Allam, ElTakmilia Company, executed the waterproofing specifications meticulously developed by Beton Technical Office, Xypex Egypt, and Engineer Amr…
Learn more

Tunnel 45

Located next to the Mediterranean, the tunnel faced several challenges due to chemicals in the water and extreme hydrostatic pressure. Tunnel 45 was constructed using Xypex Admix C-1000 NF, which was added to the concrete mix at the time of batching, speeding up the construction schedule. This admixture was chosen for its superior ability to…
Learn more

Veranda Compound, Solik

The Veranda Compound project, located in Smouha, Alexandria, Egypt was completed in 2023 under the ownership of the Armed Forces Engineering Authority, the project aimed to provide high-quality residential units within a modern living environment. As the main contractor, Solik for Real Estate Development oversaw the execution of the project, ensuring adherence to stringent engineering…
Learn more

Al Amria Petrolum Company, Wastewater Tanks

In a collaborative effort, the Al Amria Petroleum Company, under the Egyptian Government, built new wastewater tanks in Alexandria, Egypt, utilizing Xypex Admix C-1000 NF for waterproofing. This project targeted the containment of wastewater with pH levels from 3 to 4, leveraging Xypex's ability to enhance concrete durability through crystalline growth, which provides an effective…
Learn more

Address East Compound

For the Address East Compound project in New Cairo, Egypt, owned by Dorra Group, Shield for Specialized Constructions executed the waterproofing, using specifications and materials supplied by Beton, the Xypex agent in Egypt. The project utilized Xypex Concentrate for its critical waterproofing needs, including roofs, foundations, swimming pools, and water features. Xypex Concentrate was selected…
Learn more

Accountability State Authority Compound

In 2015, the Accountability State Authority's compound in Alexandria, situated along the Canal Suez road, embarked on a waterproofing project for its 8,000 square meter basement, utilizing Xypex Concentrate. This product is known for its unique crystalline technology that penetrates the concrete to form a durable barrier against water infiltration. Unlike traditional methods, Xypex reacts…
Learn more

Alamin Project Hamra Port

Hamra Port in Alamin City, on the North Coast of Egypt used Xypex Admix C-1000 NF in the concrete to enhance durability against seawater, specifically targeting the raft slab and buildings over the sea. This method marks a pioneering approach to coastal residential construction, emphasizing long-term structural integrity. Xypex products address critical issues like water…
Learn more

Al Zohour Club Japanese Lake & Olympic Swimming Pool

In 2019, the Al Zohour Club in Nasr City, Cairo, Egypt, embarked on renovations to the Japanese Lake and Olympic Swimming Pool, using Xypex Crystalline technology for waterproofing and concrete protection. A 15 cm concrete layer on the lake floor was included Xypex Admix C-1000 NF to ensure waterproofing and long-term durability. Xypex Concentrate was…
Learn more

Hayat Marseilia Compound

The Hayat Marseilia Compound, located in Elsiouf, Alexandria, Egypt, was completed in 2019 required a strong focus on foundation waterproofing due to the soil and groundwater having elevated chloride levels from the water nearby, posing a significant threat to concrete and the reinforcing rebar. Xypex Admix C-1000 NF and Xypex Concentrate was specified to ensure…
Learn more

Old Olympic Swimming Pool, Smouha Olympic Center

The rehabilitation and waterproofing of the old swimming pool at Smouha Olympic Center in Alexandria, Egypt, was successfully executed using Xypex Concentrate. The project, overseen by the Marine Company for Construction and guided by consultant Prof. Dr. Shafik Khoury, aimed to restore the pool's structural integrity and ensure long-term water resistance while protecting it from…
Learn more

Armonia Compound

For the new Armonia Compound in New Capital, Egypt, Xypex Concentrate was essential in providing comprehensive concrete waterproofing solutions for various critical concrete structures, including roofs, foundations, reservoirs, swimming pools, and landscapes. The project's owner, TLD, alongside main contractors El Tayebi and Asass, and consultants ANP & Partners, required a robust waterproofing system capable of…
Learn more

Grain Silos

To waterproof and safeguard new grain silos in Behira, Smouha, and Bani Mazar, Elmenya, contractors applied Xypex Admix C 1000 NF to the horizontal slabs and used Xypex Concentrate for wall repairs. This approach was specifically designed to shield the structures from up to 8 meters of hydrostatic pressure, thereby enhancing their durability and waterproofing…
Learn more

Alexandria Water Company Water Treatment

The Alexandria Water Company in Egypt undertook a project to waterproof their concrete water stations. Starting in 2017, the project's objective was to ensure permanent waterproofing, increased concrete durability, and protection against chlorine. It involved the collaboration of eight contractors under the supervision of the Alexandria Water Company. To ensure the success of the project,…
Learn more

Capital Business Park

The newly constructed Capital Business Park in Cairo, Egypt, is the city's first exclusive professional business hub. For its waterproofing needs, Xypex Concentrate was used to enhance durability and efficacy. Elkhatib & Allami led the project supervision, with engineer Hassan Shahtout from the Beton technical office providing consultation. The waterproofing scope spanned 10,000 square meters,…
Learn more

Private Farm – Fertilizer Pit

These concrete fertilizer pits on a farm outside of Cairo had to be rendered impermeable to the attack of the chemicals used to decompose the material wastes within them. Xypex Concentrate was applied to the surface of the structures. Subsequent inspections indicated no leakage or deterioration of the concrete.
Learn more

Hacienda Bay, by Palm Hills

The Hacienda Bay is a beachfront residential development in Egypt built by a prominent real estate developer. Contractor Hassan Allam was responsible for fulfilling the waterproofing needs of the project. Dr. Shafik Khoury and Dr. Walid Shalabi served as the overseeing consultants.  Xypex Admix C-1000 NF and Xypex Concentrate were used to waterproof various structures,…
Learn more

Muruj Smouha

Under the supervision of the Armed Forces Engineering Authority of Egypt, Beton Company and Al-Batony Engineering & Contracting used Xypex Concentrate to permanently protect and waterproof the base slab for the Muruj Compound located in Alexandria, Egypt.  Xypex Concentrate consists of Portland cement, finely graded sand and active proprietary chemicals. It is applied as a…
Learn more

Ezz Steel

Beton Technical Office's consulting team, in partnership with the contractor, United for Waterproofing, used Xypex Admix C-1000 NF to waterproof the roofs and water tanks of Ezz Steel's facilities in Sadat City, Egypt.  Xypex is a unique chemical treatment for the waterproofing, protection, and improvement of concrete. Xypex Admix C-1000 NF is added to the…
Learn more

Cairo Metro Line 3 Phase 3 & 4

In the Cairo Metro Underground project, specifically for Line 3, Phase 4, Vinci served as both contractor and consultant, facing considerable challenges, particularly with the initial waterproofing material. To address these issues, the project team opted for Xypex Concentrate, a move that significantly improved the waterproofing of stations and water tanks within the project. A total…
Learn more

Valore Antoniades Compound

The Valore Antioniades project, located in Alexandria, Egypt and developed by Valore Real Estate Investment Company, used Xypex products for waterproofing against high hydrostatic pressure of up to 4 meters. Spanning around 22,000 square meters, the development includes seven blocks and 20 residential towers. Xypex Admix C-1000 NF was integrated into the concrete mix for…
Learn more

Suez Canal Road Tunnels

Four subcontractors, one each for the four highway tunnels, applied the Xypex Concentrate where needed. According to Amr Saad, approximately 95 percent or more of the seepage has been stopped using Xypex Concentrate. In early January 2018, the last of four identical Herrenknecht Mixshield S-960 tunnel boring machines (TBMs) emerged from its 13.02 m (43…
Learn more

Rod el Farag Axis Bridge

The 1,000 kilos of Xypex Concentrate required for the Rod el Farag Axis Bridge project were provided by the Xypex distributor for Egypt, Beton Alexco, of Alexandria, Egypt. It took the Arab Contractors crew just 24 hours to treat the six main columns of the Rod el Farag Axis Bridge with Xypex Concentrate. The huge…
Learn more