High Speed Train Station Wady El Natroun

The High Speed Electrical Train project connecting Ain Sokhna and Al Alamein, under the supervision of the main contractor Hassan Allam Construction and consultant ECG, used Xypex crystalline waterproofing technology to ensure the durability and longevity of its infrastructure. The retaining walls at the Wady El Natroun station is protected using Xypex Concentrate, supplied by Beton and specified by Xypex Egypt under the guidance of Eng. Amr Saad. The waterproofing work was expertly executed by City Build, led by Eng. Arnest Fayez. Completed in 2023, this project showcases the effectiveness of Xypex Concentrate in providing robust waterproofing solutions that withstand extreme environmental conditions, ensuring the structural integrity and resilience of critical transport infrastructure.